Innisfail · Case study
Cold room at an Innisfail hall. Whole new system.
Stop by stop
5 stops on the job
-
RoofRoof
The old pipework and wiring came out at the roof penetration.
-
New condenserNew condenser
The new condensing unit set on the metal roof and connected.
-
Cold roomCold room
A new ceiling-mounted evaporator fitted inside the cold room.
-
Strip curtainStrip curtain
The insulated panels, shelving and strip curtain at the door all stayed as they were.
-
Weather housingWeather housing
The finished housing on the roof, with the company sticker on it.
Drag to compare
Rusted out, then new

The tricky bit
Keeping the weather off
Up on the roof we built a white powder-coated housing over the compressor and condenser. It keeps the weather off the unit, which matters in this part of the country.
The result
Whole new system running
The cold room at the hall now runs on a whole new refrigeration system, from the roof-mounted condenser down to the evaporator inside. The old corroded gear is gone and the new condenser sits under a weatherproof housing on the roof.
Running 20 Jul 2026
- System
- Cold room refrigeration
- Removed
- Old rusted Tecumseh condensing unit
- Where
- Innisfail
Full job notes
From a rusted, worn-out condensing unit to a whole new cold room refrigeration system.
The cold room at a hall in Innisfail was running on an old refrigeration system that had reached the end of its life. The Tecumseh condensing unit up top was rusted out and past repair. The job was to remove the lot and install a whole new system.
We started by pulling out the old gear. The corroded condensing unit came off the roof and went onto the ute tray. The old evaporator inside the cold room came out too, along with the old pipework and wiring at the roof penetration.
With the old system gone, we set the new condensing unit on the roof and got it connected. New copper pipework was run and the electrical connections were made up. Inside the cold room, we fitted the new ceiling-mounted evaporator. The insulated white panel walls, the shelving and the plastic strip curtain at the door all stayed as they were.
Up on the roof, we built a new weatherproof housing over the compressor and condenser. It's white powder-coated and sits on the corrugated metal roof. The housing keeps the weather off the unit, which matters in this part of the country. This is similar to the sort of work we've done on a cold room in Mirrawinni.
The cold room panels and drain pipe were already in good shape, so the work centred on the refrigeration itself. Once the new system was charged and running, we checked it over and left the site tidy. The completed housing carries the company sticker so it's easy to know who to call down the track.
It's straightforward changeover work, but the cold room now has a full new system behind it instead of a rusted one on its last legs.
New roof-mounted condenser
A new Tecumseh condensing unit was installed on the corrugated metal roof, replacing the old rusted one that had corroded through.
Weatherproof roof housing
A white powder-coated housing was built over the compressor and condenser to keep the weather off the unit up on the roof.
New evaporator inside the cold room
A new ceiling-mounted evaporator was fitted inside the cold room, keeping the existing insulated panels, shelving and strip curtain in place.
What we did
- Removed the old rusted Tecumseh condensing unit from the roof
- Removed the old evaporator, pipework and wiring from the cold room
- Installed a new condensing unit on the roof
- Ran new copper refrigeration pipework and electrical connections
- Fitted a new ceiling-mounted evaporator inside the cold room
- Built a new white powder-coated weatherproof roof housing over the condenser
- Charged and tested the new system and cleaned up the site
Cold rooms too
Cold room not holding?
Need a cold room system checked or replaced? Get in touch for a quote.
Call for an on-site quote 0459 737 893
Next job
Split System Cleans in Mourilyan →















