El Arish · Case study
Split systems on an El Arish block home, in the rain.
Stop by stop
3 stops on the job
-
Window wallWindow wall
A condenser on its bracket beside the window, ladder and drop sheet still out.
-
Corner wallsCorner walls
A pair on the corner walls, with the conduit run up to the roofline.
-
Side wallSide wall
Below the eaves next to the downpipe, kept level and clear.
The tricky bit
Brackets for block walls
The house is besser-block, so the outdoor condensers had to be fixed to the block walls with brackets rated for it.
The result
Every unit on properly
The home now has its split systems mounted and connected, with the condensers sitting square on the block walls and the conduit run neatly to the roofline. The rain stretched the job to two days, but every unit went on properly and the lines were run back to the isolators.
Running 30 Jun 2026
- Brand
- Mitsubishi
- System
- Inverter split systems
- Where
- El Arish
Full job notes
From bare block walls to mounted split systems ready to run.
This El Arish home needed split system air cons installed, and we handled the job across two days because of the rain. The house is besser-block, so the outdoor condensers had to be fixed to the block walls with brackets rated for it.
We started by setting the positions for the outdoor units. Multiple split systems went on, so we worked around the building to get each condenser sitting square on its brackets. Mitsubishi units were used for the job.
With the condensers mounted, we ran the refrigerant and electrical conduit up the block walls to the roofline. That conduit was kept tidy and close to the wall, following the eaves where it needed to. An isolator box was fitted alongside each unit so the power can be shut off at the wall.
Rain is part of the deal at this time of year up here. We don't rush an install just to finish in one hit. Where the weather stopped us safely running lines or making connections, we packed up and came back the next day. The step ladder and drop sheet stayed out while the work was still going.
One unit sits below the eaves on the side wall next to a downpipe. Another pair went on the corner walls where the conduit runs up to the roofline. Getting each one level and clear of the downpipes and windows was the main thing to watch on a block home.
Once every condenser was mounted and the conduit was run back to the isolators, we made the connections and tidied up. Split systems on a besser-block home are straightforward work, but the block walls and the rain meant we had to plan the bracket fixings and the two-day run properly. It's the kind of job where taking the extra day beats leaving lines half done in the wet.
Block wall mounting
The condensers were fixed to besser-block walls on brackets, kept level and clear of the downpipes and windows.
Tidy conduit runs
Refrigerant and electrical conduit was run up the walls and along the eaves back to the isolator boxes.
Mitsubishi units
Mitsubishi Inverter outdoor condensers were used across the home.
What we did
- Installed multiple split system air cons on a besser-block home
- Mounted Mitsubishi outdoor condenser units on wall brackets
- Ran refrigerant and electrical conduit up the block walls to the roofline
- Fitted isolator boxes alongside each condenser unit
- Completed the install over two days due to rain
Block home?
Need splits on a block home?
Need a split system installed? Get in touch for a quote.